Protech together with TTU Urbanowicz performs a task leading to construction of almost 1,5 km of 4,0 MPa steam pipeline from a power plant to new fertilizer plant expansion project.

The engineering works we have been doing for TTU Urbanowicz include civil design with calculations of existing pipe rack structures as well as new piping supports, cat-walks and service platforms, concrete foundations for new equipment and full piping modelling, engineering and 2D documentation (detailing / workshop).

The model is being made in 3D that let us generate preliminary bill of material within 3 weeks only.